Priced field takeoff

TakeoffField DC

Count, measure, and price a change-order line before the field number leaves the aisle. Waste, labor hours, burdened rate, markup, and field-productivity adjustment stay visible.

3free priced lines
$9.99one-time Pro
0accounts or ads
TakeoffField DC feature graphic showing priced takeoff totals and construction quantity inputs

Built for the field-side number.

The app is not a plan-scaling tool or a sealed estimate. It performs deterministic arithmetic on the user's own counts, tape measurements, waste factors, labor hours, rates, and markups.

Count, length, or area

Use a giant tally, keyed lengths, or keyed areas, then carry the takeoff through waste and pricing without re-keying in a trailer spreadsheet.

Field-verify delta

Compare estimate quantity against field quantity and flag the overage as a change-order line before it becomes missed work.

Export the math

Pro unlocks unlimited lines plus PDF, CSV, and one-line card export through the Android share sheet.

Every line shows its work.

Material quantity, book hours, realistic field hours, labor cost, markup, and final price stay auditable before anything is sent to a PM or GC.

TakeoffField DC dashboard with priced line total

Dashboard total

TakeoffField DC line editor with quantity and markup fields

Line editor

TakeoffField DC onboarding screen

Clear first run

TakeoffField DC documents table on tablet

Change-order docs

Offline by default. Honest by design.

Project names, assemblies, lines, and exports stay on the device. Google Play billing is used only for Pro purchase and restore.

TakeoffField DC does not create accounts, run ads, collect analytics, use location, use the camera, or send project records to Anvilfield.

$9.99

One-time Pro unlock for unlimited priced lines plus PDF, CSV, and card export. The free tier prices the first 3 lines with full math shown.

Read privacy details