Android field tool

Cable reel remaining length log

Track feet left on partial cable reels, log every pull, estimate remainders, and export a yard balance.

Reel Remainder Log feature graphic with cable reel rows and remaining feet

Know what is left

Each reel has one current balance, low flag, audit state, location, and pull history.

Log pulls fast

Pulls, add-backs, corrections, over-pulls, and undo events are recorded in the ledger.

Send the yard balance

Export CSV, JSON backup, PDF balance sheets, JPEG reel cards, and ZIP archives.

Ledger screen with low-first cable reel balances
Know the feet left before a crew stages a reel.
Pull entry sheet with balance fields and save action
Log a pull in seconds and catch over-pulls.
Estimator screen with reel diagram and dimension fields
Estimate a partial reel with clear unit labels.
Export screen with CSV, JSON, PDF, JPEG, and ZIP choices
Export the yard balance for the PM.

Built for cable yards and cages

Questions

How do I know how many feet are left on a partial cable reel?

Add the reel, enter known feet or use the estimator, then log each pull so the balance stays current.

Does Reel Remainder Log need barcodes or cloud sync?

No. It works on one Android device with manual entry, photos, local storage, and share-sheet exports.

Is the estimator a certified measurement?

No. It is an approximation from your dimensions. Check critical pulls with a footage counter or the reel tag.

Privacy

Reel Remainder Log does not use accounts, ads, analytics, a backend, or cloud sync. Read the app privacy policy at anvilfield.com/reelremainderlog/privacy.

Support: support@anvilfield.com