RackSet DC Terms of Use
Publisher: Anvilfield. Contact: [email protected].
RackSet DC is a field record tool for datacenter rack crews. It helps you record project values, rack photos, plumb readings, anchor details, witness signatures, and export packages from values you enter or capture on the device.
You are responsible for checking all inputs against the project documents. The engineer of record, authority having jurisdiction, and project specifications govern the floor system, spread-plate detail, plate thickness and grade, pedestal and understructure adequacy, and seismic anchorage.
RackSet DC does not provide structural engineering, design approval, inspection approval, or a professional stamp. Do not use the app as the only basis for accepting a rack, floor system, spread plate, or anchor installation.
The app is provided as is, without a warranty that it is fit for a particular job, code requirement, project specification, or device condition. To the fullest extent allowed by law, Anvilfield is not liable for indirect, incidental, special, consequential, or project-delay damages from use of the app.
You must use the app lawfully and only with content you have the right to capture, store, and share. Do not upload or share exported records unless your project rules allow it.
Terms URL: https://anvilfield.com/subapps/rackset-dc/terms
Last updated: June 4, 2026.