Capture both ends
A-side and Z-side ports, circuit ID, media, cable ID, owner, notes, barcode scan, and manual entry fallback.
Data center turn-up record
Record the A-side demarc panel-port, Z-side cage panel-port, circuit ID, cable ID, media, and jumper owner before the turn-up dispute turns into guesswork.
A-side and Z-side ports, circuit ID, media, cable ID, owner, notes, barcode scan, and manual entry fallback.
Track planned, installed, turned-up, and disputed ports with text status, icons, and owner labels.
Create CSV, PDF, photo-bound records, and demarc cards from on-device data. No account or backend is required.




PatchRecord DC does not test a circuit. The carrier turn-up and owner system remain the gate. The app is a field record and dispute aid for the demarc and jumper ownership.