Measure and grade
Read level as inches per 10 ft, enter lippage, and grade each panel against the limits from your project spec.
FloorGrid DC is Anvilfield's offline Android tool for raised-access-floor level, lippage, cut-tile, load-test, and QA packet work.
Lay the pedestal grid to the rack plan, prove panel level and lippage, and build the QA packet that releases the hall to rack-set.
Read level as inches per 10 ft, enter lippage, and grade each panel against the limits from your project spec.
Save readings to a panel grid keyed to the hall module and rack plan. Mark pass, marginal, fail, cut-tile, and heavy-rack cells.
Preview local PDF and CSV packets with grid maps, logs, cut-tile records, load tests, plenum notes, and signature lines.
The app has no developer-run server, no account flow, no analytics SDK, and no ad SDK.
Hall data, readings, settings, packet paths, and cached Pro status stay in app-private storage on the device.
Files leave the device only when you tap export, share, or print and choose where to send them.
Purchase and restore use RevenueCat-backed Google Play only when tapped. A verified Pro license is cached for offline use.
Anvilfield does not collect FloorGrid DC field records. The app stores work records locally and has no backend. RevenueCat and Google Play process purchase history for the Pro entitlement when you tap purchase or restore.
No. It is a field check and packet tool. Use the project-required survey when the spec calls for it.
Yes. Field work, storage, math, and export work offline. Purchase and restore use RevenueCat-backed Google Play when tapped.
No. It stores the case structure and user-entered project limits without reprinting copyrighted tables.
Phone readings are field checks. Use a calibrated project instrument when the spec requires survey-grade acceptance.